
An AI project costs a lot before it returns anything: scoping, data preparation, a prototype, testing, fixes. France's innovation tax credit, the crédit d'impôt innovation (CII), can fund part of it, provided the project looks like what the tax administration calls a prototype of a new product. Many business owners discover the condition too late, once the prototype already runs in production and the year's expenses are closed. Here is what the scheme really covers, how the amount is calculated, and the three boundaries that lose an otherwise legitimate file.
Key Takeaways
- The CII covers 20% of eligible expenses in mainland France, capped at €400,000 of expenses a year, so €80,000 of credit at most.
- It is reserved for SMEs under European Union law and only funds the design of a prototype or pilot installation of a new product, never operations.
- Software counts as an intangible asset, so an AI agent can enter the base if its performance beats products already on the market at the start date of the work.
- Production-phase expenses and anything already declared under the research tax credit are excluded; public subsidies received are deducted from the base.
- The scheme applies to expenses incurred until 31 December 2027, and a ruling request lets you validate eligibility before spending.
What the scheme actually funds
The CII is an extension of the research tax credit created in 2013, reserved for SMEs. Bercy (2025) sets out the current framework: the 2025 finance act "reconduit le dispositif pour trois ans", until 31 December 2027, and "abaisse le taux de 30 % à 20 %", cutting the rate from 30% to 20%.
Three formal conditions come first. The company must be an industrial, commercial or agricultural SME, taxed on a real basis for corporate or income tax, or exempt and belonging to certain categories (young innovative company, regional aid zone, rural revitalisation zone, among others). It must incur design expenses, not sales expenses.
The project itself must meet two cumulative conditions, again per Bercy: the product "ne doit pas encore avoir été mis à disposition sur le marché", it must not yet be available on the market, and it must stand out from existing products through superior performance in technical terms, eco-design, ergonomics or features. The detail that matters sits in the doctrine: the comparison is made at the start date of the work, not at the time of an audit. That is why documenting the state of the market before writing the first line of code is worth the effort. The prototype itself must not be intended for sale: it serves as a model.
The rate depends on location. The Directorate General for Enterprises (2025) gives 20% in mainland France, 60% in the overseas departments, 35% in Corsica for a medium-sized company and 40% for a small one.
One note on how this fits with other aid. The CII is not a grant: it is declared to the tax office and offset against tax. To place it among the other possible funding routes, our overview of public aid for an AI project describes the three stages, from diagnosis to prototype.
Can software or an AI agent qualify?
Yes, under conditions, and this is the most misunderstood point. A fact sheet from DRIEETS Île-de-France (2017) says it plainly: the CII "concerne autant des biens corporels que des biens incorporels (logiciels)", covering tangible goods as well as intangible ones such as software. A software product is therefore not excluded by nature, contrary to a widespread intuition that reserves the credit for mechanical industry.
The same sheet sets the limits. Service, process, organisational and marketing innovations are excluded from the credit. However, a good that will be sold as a service, such as SaaS software, can qualify. The DGE adds a useful nuance in 2025: only the technological part of a service innovation is potentially eligible for the CII.
Translated for an AI project. An agent that drafts replies from an off-the-shelf model, plugged into an existing management tool, is a service innovation: the technological part is thin, and the operational gain is not enough. An agent whose decision engine, document retrieval architecture or interface answers an uncovered need, with measurable performance against market products, falls into another category. What separates the two is not technical sophistication seen from the inside, it is the comparison with what already exists, written down at the start.
If your project starts from a still vague business need, the specification document for an AI project is where that comparison gets pinned down. And if you are weighing a market tool against a custom build, our page on custom AI agents describes what a design engagement covers, prototype included.
The three boundaries that lose the file
Prototype or production
This is the most expensive boundary. Bercy is explicit: expenses tied to the production phase of the prototype or pilot installation of the new product are not eligible. The DGE repeats the same exclusion and points to the tax doctrine. In practice, the day the agent handles real requests at scale, with supervision, corrections and monthly inference costs, you have crossed into operations. Those expenses exist, they are legitimate, they are simply not in the base.
The practical consequence is a split. An AI project runs in two separate budget phases: design and validation of the prototype, then go-live. Mixing both in a single accounting line weakens the whole file, including the part that was eligible.
Innovation credit or research credit
The two schemes look alike and do not stack on the same expenses. Bercy states that expenses already included in the research tax credit cannot be counted for the CII. The DGE gives the sorting rule: if the project advances the state of the art in the tax sense, it is the research credit; if it allows the design of a prototype with superior performance, it is the CII.
On an AI project, both can coexist over time. An experimentation phase to remove a technical obstacle, for instance an in-house model trained on a business corpus with uncertain results, leans towards the research credit. The prototyping phase of a product intended for the market leans towards the CII. The DRIEETS sheet sums it up: an experimental prototype needed for research is eligible for the research credit but not for the CII. You therefore need separate time sheets, and the ability to tell your accountant which hour belongs to which scheme.
In-house or subcontracted
In-house expenses are eligible: staff costs allocated to the work, operating costs, depreciation, intellectual property costs, according to the DRIEETS sheet. For external spend the rule is tighter: Bercy mentions expenses incurred by approved companies or engineering consultancies, and the DRIEETS sheet refers to subcontracting to a company approved by the Ministry of the Economy.
In other words, a supplier without approval can deliver an excellent prototype: the invoice is still due, but it leaves the base. That is a question to ask before signing, not after. A quote that promises a CII without checking this point creates an expectation the tax office will not honour. To frame that kind of engagement, our article on evaluating an AI demo before signing lists the checkpoints that matter beyond price.
The calculation, from gross to net
The base is capped at €400,000 of expenses a year. The DRIEETS sheet draws the arithmetic: at 20%, the maximum credit for a single calendar year is €80,000, whatever the number of projects in that year. The cap is annual, not per project: two prototypes run in parallel share the same envelope.
Two corrections then apply. Public subsidies received for the project are deducted from the expenses taken into account, Bercy states. And the credit is calculated per calendar year, from 1 January to 31 December, regardless of the financial year-end.
An example, as an illustration of the rules rather than a promise. An SME incurs €180,000 of eligible expenses on an agent prototype: at 20%, the theoretical credit is €36,000. If it received €20,000 of regional subsidy on the same project, the base drops to €160,000 and the credit to €32,000. The two forms of aid do not add up, the second reduces the first.
Then there is how the credit is used. It offsets corporate or income tax for the year of the expenses. If the credit exceeds the tax due, the balance carries forward for three years, then is refunded. Some companies can request an immediate refund: those less than two years old, young innovative companies, firms in insolvency proceedings, among others, per Bercy. For an SME investing before it is profitable, that detail changes the project's cash flow.
Declaring, securing, defending
The declaration goes through form 2069-A-SD, section IV, filed with the results declaration. Deadlines differ by regime: the 15th of the fourth month after the financial year-end for corporate tax, and, for income tax, 15 days after the second working day following 1 May, according to Bercy. The DGE notes that a guidance notice and an optional model justification file now exist on the tax website.
The ruling request is the most underused protection. The DGE describes it as a formal position from the administration on the project's eligibility, enforceable in a later audit, provided the actual situation matches the one described. The request must be filed at least six months before the deadline for the declaration. The administration answers within three months, otherwise its opinion is deemed favourable. A company can file several requests on the same project if it evolves.
Finally, an omission is not permanent. The DRIEETS sheet states that a company can correct its declaration or file a new one until 31 December of the third year following the one in which the expenses were incurred. That does not remove the need to rebuild the evidence: time sheets, technical reports, a performance comparison at the start date, records of architecture decisions. A CII file is won on documentation, not on argument.
FAQ
Is an AI agent that answers customers eligible for the CII?
Rarely as it stands. The CII targets the design of a prototype of a new product with performance superior to the market, and excludes the production phase. An agent in operations, even backed by a strong model, sits on the service innovation side, where only the technological part can be retained. The file is built on an identifiable prototype with comparative measurements, not on a service already online.
Do I need a specialised consultancy to prepare the file?
It is not mandatory. The ruling request is filed directly with the corporate tax office, using a standard form. The Médiateur des entreprises also keeps a list of research and innovation credit consultancies that commit to a common reference framework, without that listing being enforceable against the administration. For an SME, the trade-off is between the consultancy fee and the internal time needed to document expenses properly.
Is the credit useless if the company pays no tax?
No, but there is a delay. The credit offsets tax due, then carries forward for three years. Beyond that, the balance is refunded. Companies less than two years old, young innovative companies and a few other situations allow an immediate refund request for the unused balance, according to Bercy.
Can the CII be combined with a regional grant or Bpifrance funding?
The amounts do not add up. Public subsidies received for the project are deducted from the base, so the credit shrinks as the subsidy grows. The calculation still matters: aid that funds the upstream phase can make the project affordable even if it reduces the tax credit. For schemes run by the public investment bank, our article on what Bpifrance funds details the scope.
What amount for an AI agent prototype invoiced at €120,000?
At 20%, and if the whole expense enters the base with no subsidy, the credit is €24,000. That figure assumes three things: the supplier is approved, the expense genuinely covers prototype design rather than go-live, and the novelty of the product is documented against the market at the start date of the work. If one of these is missing, the amount falls, sometimes to zero.
Conclusion
The innovation tax credit is not funding for AI in general. It funds the design of a new product, with a clear boundary between prototype and operations, and an evidentiary requirement prepared before the work starts. The projects that recover something are those that documented the starting point, separated the phases, and raised the question of supplier approval at quote stage.
Before committing a budget, it is worth qualifying the project: is it a prototype of a new product, a service innovation, or operations dressed up as innovation? Our audit and advisory offering exists to settle that question, and the contact page lets you discuss it with us before drafting the file.


